About a week
and a half ago my brother took the afternoon off and put a screw into each of
the PVC frame joints. That is a lot of
pilot hole drilling and screwing. Thank
goodness for cordless drills.
I had to work
through the weekend last week so I wasn’t able do any work on the
boat.
This past
Saturday, I Finished the frame by putting a vertical PVC support and a boom
support in the cockpit area. I also
removed the boat batteries, bow pulpit and the port side life lines and
stanchions.
On Sunday my
brother and I removed the starboard side stanchions, life lines and the stern
pulpit.
I had to
crawl into the aft cockpit locker in order to get at the bolts holding the stern
pulpit. The hardest part was getting my
shoulders through the narrow opening.
Once inside it wasn’t too bad.
Climbing into the stern locker |
Not so bad once inside |
No comments:
Post a Comment